{"id":8578,"date":"2025-03-26T17:15:18","date_gmt":"2025-03-26T21:15:18","guid":{"rendered":"https:\/\/wpw.bnl.gov\/rgupta\/?page_id=8578"},"modified":"2025-12-28T21:45:48","modified_gmt":"2025-12-29T02:45:48","slug":"eic-q2pf-em","status":"publish","type":"page","link":"https:\/\/wpw.bnl.gov\/rgupta\/eic-q2pf-em\/","title":{"rendered":"EIC Q2pF EM Design &#8211; Work in Progress"},"content":{"rendered":"\n<p>(<strong>Work on this and other EIC magnets can be found at<\/strong>:<br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/eic-work-in-progress\/\">https:\/\/wpw.bnl.gov\/rgupta\/eic-work-in-progress\/<\/a>)<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2025\/04\/Q2PF-MSG-18-april-2025-gupta-v3.pdf\">Q2pF Electromagnetic Design, Magnet Steering Group meeting,<\/a> April 18, 2025. (<a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2025\/03\/strategy-for-FQ-in-1st-magnet.pdf\">addendum for informal notes on strategies to assure good field quality in the 1st magnet<\/a>).<\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2025\/04\/Q2PF-FNAL-april-10-2025-gupta.pdf\">Q2pF EM Design Updates, Meeting with Fermilab Colleagues, April 10, 2025.<\/a> (<a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/04\/Q2PF-meeting-with-fnal-04-18-2024-gupta.pdf\">link to April 18, 2024 presentation<\/a>).<\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/08\/EIC-gupta-Q2pF-Ends-08-14-2024.pdf\">Status of Q2pF OPERA3d Model, August 20, 2024.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/05\/EIC-gupta-Q2pF-rev-lead-End-04-23-2024.pdf\">Status of Q2pF End Design for updated turn-to-turn spacing, April 23, 2024.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/04\/Q2PF-meeting-with-fnal-04-18-2024-gupta.pdf\">Status of Q2PF Quad EM Design, Meeting with Fermilab on Options for EIC SC Forward Quadrupoles, April 18, 2024.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/04\/EIC-gupta-Q2pF-rev-lead-End-04-09-2024.pdf\">Revised Q2pF Lead End for updated turn-to-turn spacing, April 9, 2024.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/03\/EIC-gupta-Q2pF-rev-RT-End-03-12-2024.pdf\">Revised Q2pF Return End for updated turn-to-turn spacing, March 12, 2024.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/03\/EIC-gupta-Q2pF-rev-xsect-03-05-2024.pdf\">Revised Q2pF Cross-section with updated turn-to-turn spacing, March 5, 2024.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/03\/EIC-gupta-3D-Q2pF-02-27-2024b.pdf\">Q2pF Coil with Lead and Return Ends, February 27, 2024<\/a>.<\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/02\/Magnet-Status-Review_Q2PF-02-07-2024rev1.pdf\">Q2PF EIC IR SC Magnet design Status, February 7, 2024<\/a>.<\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/02\/EIC-gupta-3D-Q2pF-02-06-2024.pdf\">Towards the Design of Q2pF Lead End, February 6, 2024<\/a>.<\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/02\/EIC-gupta-3D-Q2pF-01-30-2024.pdf\">Tunability of Q2pF End Design, January 30, 2024.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2024\/01\/EIC-gupta-3D-Q2pF-01-23-2024a.pdf\">Status of Q2pF Return End Design, January 23, 2024.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/12\/EIC-gupta-tuning-shims-Q2pF-12-19-2023.pdf\">Investigation of Tuning Shims in Q2pF, December 19, 2023.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/12\/EIC-gupta-3D-Q2pF-12-12-2023.pdf\">Status of Q2pF End Design, December 12, 2023.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/11\/EIC-gupta-3D-Q2pF-11-07-2023.pdf\">Progress in Q2pF End Design, November 7, 2023.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/09\/mt28-eic-q2pf-gupta.pdf\">Magnetic design of the interaction region quadrupole Q2pF for EIC, Poster at MT28 \u2013 International Conference on Magnet Technology (https:\/\/mt28.aoscongres.com\/home!en), September 15, 2023.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/08\/EIC-gupta-tuning-shims-Q2pF-08-01-2023.pdf\">Investigation of Tuning Shims in Q2pF, August 1, 2023<\/a><\/li>\n\n\n\n<li><strong><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/07\/EIC-gupta-tuning-shims-07-18-2023.pdf\">Tuning Shims to Achieve Good Field Quality in Q2pF and Other EIC Magnets, July 18, 2023<\/a><\/strong><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/06\/EIC-gupta-3D-Q2pF-06-20-2023.pdf\">Progress in Q2pF Design (Symmetric Wedges), June 20, 2023.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/05\/EIC-gupta-3D-Q2pF-05-30-2023.pdf\">Investigation of Q2pF Ends for Favorable Tilt Angles, May 30 2023.<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/EIC-gupta-3D-Q2pF-09-20-2022.pdf\">Detailed Results from OPERA3-d Model of Q2pF, September 20, 2022<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/EIC-gupta-3D-Q2pF-08-23-2022.pdf\">3-d Optimization of Q2pF, August 23, 2022<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/EIC-gupta-3D-Q2pF-08-16-2022.pdf\">3-d Optimization of the Magnetic Design of Q2pF, August 16, 2022<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/EIC-gupta-3D-Q2pF-06-14-2022.pdf\">Magnet Length, Margin, etc., June 14, 2022<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/EIC-gupta-3D-Q2pF-06-07-2022.pdf\">Starting of 3-d Optimization of the Magnetic Design of Q2pF, June 7, 2022<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/EIC-gupta-3D-optimization-05-24-2022.pdf\">General Approach to 3-d Optimization of the Magnetic Design, May 23, 2022<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/EIC-gupta-2022-05-10a.pdf\">Q2pF Yoke Cross-section Impact of Heat Exchanger Hole, May 10, 2022<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/EIC-gupta-2022-04-20-a.pdf\">Q2pF Yoke Cross-section(15 mm cable @ 2K), April 20, 2022<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/EIC-gupta-2022-04-13-1.pdf\">Q2pF Cross-section(15 mm cable @ 2K), April 13, 2022<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/EIC-gupta-2022-04-05v2-1.pdf\">Q2pF Cross-section for 2K Operation, April 4, 2022<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/EIC-gupta-2022-03-22.pdf\">Cable Parameters of the EIC IR Cable Magnets, March 21, 2022<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/03\/Q2pF-iteration-gupta-may18-2021.pdf\">Impact of Larger Collar and Tie Rods Holes in Q2pF Yoke, May 18, 2021<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/02\/eic-cross-section-designs-fy20-gupta-a.pdf\">EIC IR Magnet&nbsp; Design Summary (FY20), November 2020<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/02\/Q2pF-3d-gupta-sept-01-2020-1.pdf\">Q2pF 3-d Design Studies, Sept 1, 2020<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/02\/Q2pF4K-gupta-june-23-2020-draft1-1.pdf\">Q2pF Design for 4K Option, June 23, 2020<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/02\/Q2pF4K-gupta-june-16-2020-1.pdf\">Q2pF Studies for 4K Option, June 16, 2020<\/a><\/li>\n<\/ol>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.bnl.gov\/eic\/\"><strong>Click here to visit EIC homepag<\/strong>e<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/eic-work-in-progress\/\">Click here for work in progress on EIC magnet designs<\/a><\/li>\n<\/ul>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Work on this and other EIC magnets can be found at:https:\/\/wpw.bnl.gov\/rgupta\/eic-work-in-progress\/)<\/p>\n","protected":false},"author":11,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-8578","page","type-page","status-publish","hentry","entry"],"_links":{"self":[{"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/pages\/8578","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/comments?post=8578"}],"version-history":[{"count":14,"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/pages\/8578\/revisions"}],"predecessor-version":[{"id":8956,"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/pages\/8578\/revisions\/8956"}],"wp:attachment":[{"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/media?parent=8578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}