{"id":9203,"date":"2026-06-25T05:12:55","date_gmt":"2026-06-25T09:12:55","guid":{"rendered":"https:\/\/wpw.bnl.gov\/rgupta\/?page_id=9203"},"modified":"2026-06-25T06:07:06","modified_gmt":"2026-06-25T10:07:06","slug":"smes-quarterly-presentations","status":"publish","type":"page","link":"https:\/\/wpw.bnl.gov\/rgupta\/smes-quarterly-presentations\/","title":{"rendered":"SMES Quarterly Presentations"},"content":{"rendered":"\n<p>Below are the presentation during the informal quarterly meetings on the R&amp;D for the design, construction, and testing of a 25 T, 100 mm HTS R&amp;D solenoid by Superconducting Magnet Division at BNL:<\/p>\n\n\n\n<p><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2026\/06\/NC-Q14-smes-bnl-smd-final.pdf\">2014 April<\/a><br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2026\/06\/NC-Q12-smes-bnl-smd-rg-rev.pdf\">2013 December<\/a><br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2026\/06\/NC-Q11-smes-bnl-smd.pdf\">2013 August<\/a><br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2026\/06\/NC-Q10-smes-bnl-smd-15may2013.pdf\">2013 May<\/a><br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2026\/06\/NC-Q9-smes-bnl-smd-Q9-2013-feb.pdf\">2013 February<\/a><br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2026\/06\/NC-Q8-smes-bnl-smd-2012-nov.pdf\">2012 November<\/a><br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2026\/06\/NC-Q7-smes-bnl-smd-2012-aug-rev-e.pdf\">2012 August<\/a><br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2026\/06\/NC-Q6-ARPA-E-SMES-Part2-SMD.pdf\">2012 May<\/a><br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2026\/06\/NC-Q5-smes-bnl-smd-2012-feb-review.pdf\">2012 February<\/a><br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2026\/06\/NC-Q4-smes-bnl-smd-2011-nov.pdf\">2011 November<\/a><br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2026\/06\/NC-Q3-smes-coil-aug-25-gupta-sent.pdf\">2011 August<\/a><br>2011 May (<a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/11\/smes-gupta-may-2011-conductor-coil-final.pdf\">Part 1<\/a>, <a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/11\/smes-gupta-may-2011-updated-schedule-final.pdf\">Part 2<\/a>, <a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/11\/smes-gupta-may-2011-quarter1-final.pdf\">Part 3<\/a>)<br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/11\/arpa-e-04-oct-2010-rg.pdf\">2010 October<\/a><br><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/11\/bnl-abb-arpa-e-gupta-may-17-2010.pdf\">2010 May<\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/wp-content\/uploads\/sites\/9\/2023\/11\/smes-final-report.8.13.14-SMD.pdf\"><strong>Link to the Summary Report (August 14, 2014)<\/strong><\/a><\/p>\n\n\n\n<p><strong><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/smes-quarterly-reports\/\">Link to the Detailed Quarterly Reports<\/a> <\/strong><\/p>\n\n\n\n<p>SMES R&amp;D at the BNL Superconducting magnet division (and at the Advanced Energy Materials Group, Condensing Matter Physics and Material Sciences Division, not included above) was supported in part by the DOE Advanced Research Program Agency-Energy via a Cooperative Research and Development Agreement that Brookhaven National Laboratory (BNL) has with ABB, Inc. and in part by the Brookhaven Science Associates, LLC (BSA) under Contract DE-SC0012704 with the U.S. Department of Energy. Time period limitation for holding the release has now expired. Other partners were SuperPower, Inc. and University of Houston.<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/wpw.bnl.gov\/rgupta\/smes\/\">Homepage of HTS SMES R&amp;D at BNL<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Below are the presentation during the informal quarterly meetings on the R&amp;D for the design, construction, and testing of a 25 T, 100 mm HTS R&amp;D solenoid by Superconducting Magnet Division at BNL: 2014 April2013 December2013 August2013 May2013 February2012 November2012 August2012 May2012 February2011 November2011 August2011 May (Part 1, Part 2, Part 3)2010 October2010 May Link&hellip; <a class=\"more-link\" href=\"https:\/\/wpw.bnl.gov\/rgupta\/smes-quarterly-presentations\/\">Continue reading <span class=\"screen-reader-text\">SMES Quarterly Presentations<\/span><\/a><\/p>\n","protected":false},"author":11,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-9203","page","type-page","status-publish","hentry","entry"],"_links":{"self":[{"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/pages\/9203","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/comments?post=9203"}],"version-history":[{"count":11,"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/pages\/9203\/revisions"}],"predecessor-version":[{"id":9232,"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/pages\/9203\/revisions\/9232"}],"wp:attachment":[{"href":"https:\/\/wpw.bnl.gov\/rgupta\/wp-json\/wp\/v2\/media?parent=9203"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}