PBL-BNL-EIC-SBIR/STTR

SBIRs/STTRs on the Electron Ion Collider executed jointly by the team of Particle Beam Lasers, Inc. (PBL) and Brookhaven National Laboratory (all PBL/BNL awards):

  1. A New Medium Field Superconducting Magnet for the EIC. Ongoing Phase II STTR through April 2025, DE-SC0021578 April 2022 $1,1500,000, (Summary, Narrative, Presentation, Report)
  2. A New Medium Field Superconducting Magnet for the EIC. Phase I, DE-SC0021578 February 2021 $200,000, (Summary, Narrative, Presentation, Report). Phase II Funded (see above)
  3. Field Compensation in Electron-Ion Collider Magnets with Passive Superconducting Shield. Phase I, DE-SC0018614 April 2018 $150,000, (Summary, Narrative, Motivation, Paper, Poster, Report), Phase II Not Funded (Summary, Narrative)
  4. Novel Design for High-Field, Large Aperture Quadrupoles for Electron-Ion Collider. Phase I, DE-SC00186 April 2018 $150,000, (Summary, Narrative, Motivation, Paper, Poster, Report), Phase II Not Funded (Summary, Narrative)


Complete List of PBL/BNL Magnets (Papers, Talks, Awards)