PBL/BNL Awards

List of Particle Beam Lasers, Inc. (PBL) SBIR/STTR awards, primarily with BNL

  1. A New Medium Field Superconducting Magnet for the EIC. Ongoing Phase II STTR through April 2025, DE-SC0021578 April 2022 $1,1500,000, (Summary, Narrative, Presentation, Report)
  2. A New Medium Field Superconducting Magnet for the EIC. Phase I, DE-SC0021578 February 2021 $200,000, (Summary, Narrative, Presentation, Report). Phase II Funded (see above)
  3. Overpass/Underpass Coil Design for High-Field Dipoles. Phase I, DE-SC002076 June 2020 $200,000, (Summary, Narrative, Paper, Presentation, Phase I Report, Phase II Not Funded (Summary, Narrative)
  4. Quench Protection for a Neutron Scattering Magnet. Phase I, DE-SC0020466 February 2020 $200,000, (Summary, Narrative, Report), Phase II Not Funded (Summary, Narrative)
  5. HTS Solenoid for Neutron Scattering. Phase I, DE-SC0019722 February 2019 $150,000, (Summary, Narrative, Report), Phase II Not Funded (Summary, Narrative)
  6. Field Compensation in Electron-Ion Collider Magnets with Passive Superconducting Shield. Phase I, DE-SC0018614 April 2018 $150,000, (Summary, Narrative, Motivation, Paper, Poster, Report), Phase II Not Funded (Summary, Narrative)
  7. Novel Design for High-Field, Large Aperture Quadrupoles for Electron-Ion Collider. Phase I, DE-SC00186 April 2018 $150,000, (Summary, Narrative, Motivation, Paper, Poster, Report), Phase II Not Funded (Summary, Narrative)
  8. Development of an Accelerator Quality High-Field Common Coil Dipole Magnet. Phase I, DE-SC0015896 June 2016 $150,000, (Summary, Narrative, Paper, Talk, Report), Phase II Not Funded (Summary, Narrative)
  9. A Hybrid HTS/LTS Superconductor Design for High-Field Accelerator Magnets. Phase II, DE-SC0011348 April 2016 $999,444, (Summary, Narrative, Paper, Talk, Report)
  10. A Hybrid HTS/LTS Superconductor Design for High-Field Accelerator Magnets. Phase I, DE-SC0011348 February 2014 $150,000, (Summary, Narrative, Report), Phase II Funded (see above)
  11. Dipole Magnet with Elliptical and Rectangular Shielding for a Muon Collider. Phase I, DE-SC000 February 2013 $150,000, (Summary, Narrative, Report), Phase II Not Funded (Summary, Narrative)
  12. Magnet Coil Designs Using YBCO High Temperature Superconductor (HTS). Phase I, DE-SC0007738 February 2012 $150,000, (Summary, Narrative, Paper, Poster, Report), Phase II Not Funded (Summary, Narrative)
  13. Innovative Design of a High Current Density Nb3Sn Outer Coil for a Muon Cooling Experiment. Phase I, DE-SC0006227 June 2011 $139,936, (Summary, Narrative, Report), Phase II Not Funded (Summary, Narrative)
  14. Study of a Final Cooling Scheme for a Muon Collider Utilizing High Field Solenoids: Cooling Simulations and Design, Fabrication and Testing of Coils. Phase II, DE-FG02-08ER85037 August 2010 $800,000, (Summary, Narrative, Paper, Talk, Report)
  15. Study of a Muon Collider Dipole System to Reduce Detector Background and Heating. Phase I, DE-SC0004494 June 2010 $100,000, (Summary, Motivation, Narrative, Paper, Poster, Report), Phase II Proposal, “Development of Open-Midplane Dipole Magnets For Muon Accelerators”, Not Funded (Summary, Narrative)
  16. Design of a Demonstration of Magnetic Insulation and Study of its Application to Ionization Cooling. Phase I, DE-SC000221 July 2009 $100,000, (Summary, Narrative, Report), Phase II Not Funded (Summary, Narrative)
  17. Study of a Final Cooling Scheme for a Muon Collider Utilizing High Field Solenoids. Phase I, DE-FG02-08ER85037 June 2008 $100,000, (Summary, Narrative, Paper, Report), Phase II Funded (see above)
  18. A 6-D Muon Cooling System Using Achromat Bends and the Design, Fabrication and Test of a Prototype High Temperature (HTS) Solenoid for the System. Phase II, DE-FG02-07ER84855 August 2008 $850,000, (Summary, Narrative, Paper, Talk, Report)